8.1 Lifecycle
- Draft → assigned owner and due date
- Open → in progress
- Verification → awaiting evidence / sign-off
- Closed → verified and effective
Documentation Index
Fetch the complete documentation index at: /llms.txt
Use this file to discover all available pages before exploring further.
| Priority (Best to last) | Meaning |
|---|---|
| 1. Elimination | Remove the hazard completely |
| 2. Substitution | Replace it with something safer |
| 3. Engineering Controls | Isolate people from the hazard |
| 4. Administrative Controls | Change how people work (procedures, training) |
| 5. PPE | Personal Protective Equipment as last line |